Sewage and drainage projects in Al-Qadisiyah (Diwaniyah)
The Ministry of Construction lists 30 sewage and drainage projects in Al-Qadisiyah (Diwaniyah): 3 past contract end, 3 behind plan, 8 on track, 16 no progress data, as of 1 Jun 2026.
On track8
Behind plan3
Past contract end3
No progress data16
Diwaniyah sewage project, phase 2, capacity 100,000 m3 per day (turnkey), with Noor Al-Ufuq added as main partner Contract ended 14 Jan 2026, 138 days before the data date Past contract end Study, design, construction, supply, operation and maintenance of stormwater and sewage networks with lift stations and treatment plant for Sunniya district, Diwaniyah Contract ended 31 Mar 2026, 62 days before the data date Past contract end Rehabilitation of 12 residential neighbourhoods in Diwaniyah Contract ended 21 May 2026, 11 days before the data date Past contract end Ghammas sewage project, phase 1 32 points below planned progress Behind plan Study, design, construction, supply, operation and maintenance of stormwater and sewage networks with lift stations and treatment plant for Mahnawiya district, Diwaniyah 29 points below planned progress Behind plan Study, design, construction, supply, operation and maintenance of the Al Budair treatment plant, capacity 10,000 m3 per day, Diwaniyah 10.9 points below planned progress Behind plan Afak sewage project Contract ends 24 Dec 2028 On track Study, design, construction, supply, operation and maintenance of stormwater and sewage networks with lift stations and treatment plant for Sumer district Contract ends 23 Oct 2026 On track 21 lift stations in Diwaniyah province Contract ends 22 Jul 2027 On track Study, design, construction, supply, operation and maintenance of the Ayman al-Shamiya treatment plant, right bank, Diwaniyah Contract ends 26 Jan 2027 On track Remaining works on neighbourhood networks, phases 2 and 3, Diwaniyah Contract ends 31 Jan 2027 On track Sewage and stormwater networks and trunk lines to the treatment plant of Shafiya district, Diwaniyah Contract ends 12 Aug 2027 On track Sewage and stormwater networks and trunk lines to the treatment plant of Nuffar district, Diwaniyah Contract ends 18 Sept 2027 On track Sewage and stormwater networks and trunk lines to the treatment plant of Salahiya district, Diwaniyah Contract ends 22 Jul 2027 On track Street rehabilitation in the Mechanic, Nahda 1 and Wafaa neighbourhoods No progress data Street rehabilitation in Hakim 3 neighbourhood No progress data Street rehabilitation in the Istiqama and Jamiya neighbourhoods No progress data Street rehabilitation in the Uruba 3, Muallimin and Shuhada neighbourhoods No progress data Street rehabilitation in the Sob al-Shamiya and Zahraa (behind the center) neighbourhoods No progress data Street rehabilitation in the Dubbat 1, Dubbat 2 and Adhariya neighbourhoods No progress data Street rehabilitation in the Turath and Thaqafi neighbourhoods No progress data Street rehabilitation in the Sinai and Shalabiya neighbourhoods No progress data Street rehabilitation in the Ziraiyin, Ramadan and Tamim neighbourhoods No progress data Street rehabilitation in Hakim 1 neighbourhood No progress data Street rehabilitation in the Abrar, Ansar and Adala neighbourhoods No progress data Street rehabilitation in the Uruba 1 and Uruba 2 neighbourhoods No progress data Street rehabilitation in Jazair neighbourhood No progress data Street rehabilitation in the Taqiya 1, 2 and 3 neighbourhoods No progress data Street rehabilitation in the Akrad neighbourhoods (Shahid al-Mihrab and Hakim 2) No progress data Sewage and stormwater networks, trunk lines, lift stations, force mains and the Sudair treatment plant, Diwaniyah No progress data
Source: Ministry of Construction, status as of 1 Jun 2026Details