Past contract end

Study, design, construction, supply, operation and maintenance of stormwater and sewage networks with lift stations and treatment plant for Sunniya district, Diwaniyah

Sewage project No. 148 in Al-Qadisiyah (Diwaniyah).

اعداد الدراسة والتصاميم وتنفيذ وتجهيز وتشغيل وصيانة مشروع مجاري شبكات مياه الامطار والثقيلة مع محطات الرفع ومحطة المعالجة لقضاء السنية / محافظة الديوانية

Actual progress 65.5% as of 1 Jun 2026
Where the plan says it should be 100% 34.5 points behind

Progress against plan

Contract ended 31 Mar 2026, 62 days before the data date

Timeline

Started
28 Jul 2024
Contract end
31 Mar 2026
Running for
1.8 years
Data as of
1 Jun 2026