On track
Study, design, construction, supply, operation and maintenance of stormwater and sewage networks with lift stations and treatment plant for Sumer district
Sewage project No. 151 in Al-Qadisiyah (Diwaniyah).
اعداد الدراسة والتصاميم وتنفيذ وتجهيز وتشغيل وصيانة مشروع مجاري شبكات مياه الأمطار والثقيلة مع محطات الرفع ومحطة المعالجة لقضاء سومر
Actual progress 0.5% as of 1 Jun 2026
Where the plan says it should be 3% 2.5 points behind
Progress against plan
Contract ends 23 Oct 2026
Timeline
2025
2026
- Started
- 26 Feb 2025
- Contract end
- 23 Oct 2026
- Running for
- 1.3 years
- Data as of
- 1 Jun 2026