On track
Study, design, construction, supply, operation and maintenance of the Ayman al-Shamiya treatment plant, right bank, Diwaniyah
Sewage project No. 154 in Al-Qadisiyah (Diwaniyah).
مشروع اعداد دراسة وتصاميم وتنفيذ وتجهيز وتشغيل وصيانة محطة معالجة أيمن الشامية/الجانب الايمن/محافظة الديوانية
Actual progress 0.7% as of 1 Jun 2026
Where the plan says it should be 10% 9.3 points behind
Progress against plan
Contract ends 26 Jan 2027
Timeline
2025
2027
- Started
- 3 Jun 2025
- Contract end
- 26 Jan 2027
- Running for
- 1 year
- Data as of
- 1 Jun 2026