Behind plan
Study, design, construction, supply, operation and maintenance of the Al Budair treatment plant, capacity 10,000 m3 per day, Diwaniyah
Sewage project No. 155 in Al-Qadisiyah (Diwaniyah).
اعداد الدراسة والتصاميم وتنفيذ وتجهيز وتشغيل وصيانة محطة معالجة ال بدير بطاقة 10000م3/ يوم / محافظة الديوانية
Actual progress 0.9% as of 1 Jun 2026
Where the plan says it should be 11.8% 10.9 points behind
Progress against plan
10.9 points below planned progress
Timeline
2025
2027
- Started
- 2 Jul 2025
- Contract end
- 24 Feb 2027
- Running for
- 0.9 years
- Data as of
- 1 Jun 2026