Wasit واسط

Wasit has a population of 1,644,273 in the 2024 census, 11 hospitals (8 public, 3 private) and 1 public university. The Ministry of Construction lists 27 building projects here (8 completed, 7 past contract end), as of 1 Jun 2026.

Switch province
people, census 20241,644,2733.6% of Iraq
construction projects278 completed, 7 past contract end
Human Development Index0.7180.600 in 2008. Iraq: 0.712
university students28,74717,741 day, 11,006 evening

Sources: Ministry of Planning, Ministry of Higher Education, Ministry of ConstructionDetails

Projects in Wasit

From the Ministry of Construction, as of 1 Jun 2026.

All Wasit projects
Completed8
On track10
Behind plan2
Past contract end7
Widening and rehabilitation of the Kut to Baghdad main road within Wasit, 60 km (phase one) Roads and bridges No. 307 Contract ended 19 Oct 2024, 590 days before the data date Past contract end Second carriageway of the Kut, Badra and Mehran road including the Kalal Badra bridge (76 km), phase two of 36.4 km with a bridge over Wadi Kalal and an overpass at the Badra city entrance, Wasit Roads and bridges No. 305 Contract ended 10 Jul 2025, 326 days before the data date Past contract end Residential complex in Wasit, Aziziya Housing No. 83 Contract ended 4 Sept 2025, 270 days before the data date Past contract end Completion of remaining works on the Aziziya sewage network, Wasit Sewage No. 143 Contract ended 11 Nov 2025, 202 days before the data date Past contract end Zubaidiya water project in Wasit (2007) Water No. 236 Contract ended 15 Dec 2025, 168 days before the data date Past contract end Zurbatiyah border crossing, remaining works on the passenger building Buildings No. 19 Contract ended 10 Apr 2026, 52 days before the data date Past contract end
Show all 27 projects

Source: Ministry of Construction, status as of 1 Jun 2026Details

Border crossings

Land border
Zurbatiyah

Source: Border Ports Commission, published 28 Jan 2026Details

Hospitals and health centres

Public hospitals
8
Private hospitals
3
Primary health care centres
84

Source: Ministry of Health, updated 17 Jun 2026Details

Public universities

Wasit University
Founded 2003, 15 colleges

Source: Ministry of Higher Education, updated 17 Oct 2026Details

Compare with another province