On track
Maintenance of the old Kut, Badra and Mehran road, Wasit
Roads and bridges project No. 308 in Wasit.
مشروع صيانة طريق ( كوت-بدرة-مهران) الطريق القديم في محافظة واسط
Actual progress 94.9% as of 1 Jun 2026
Where the plan says it should be 95.9% 1 points behind
Progress against plan
Contract ends 4 Jun 2026
Timeline
2025
2026
- Started
- 11 Mar 2025
- Contract end
- 4 Jun 2026
- Running for
- 1.2 years
- Data as of
- 1 Jun 2026