Sewage and drainage projects in Nineveh
The Ministry of Construction lists 10 sewage and drainage projects in Nineveh: 6 past contract end, 4 on track, as of 1 Jun 2026.
On track4
Past contract end6
Supply and construction of the treatment plant for the left bank of Mosul (phase two) Contract ended 14 Apr 2024, 778 days before the data date Past contract end Supply and construction of the treatment plant for the right bank of Mosul, phase 1 Contract ended 14 Jul 2024, 687 days before the data date Past contract end Supply and construction of sewage trunk lines with four lift stations, left bank of Mosul, phase four Contract ended 3 Feb 2025, 483 days before the data date Past contract end Supply and construction of stormwater trunk lines with a lift station, right bank of Mosul, phase 4 Contract ended 10 Feb 2025, 476 days before the data date Past contract end Design review, supply, construction, operation and maintenance of the Bartella sewage network and plant, Nineveh (design capacity 4,942 m3 per day) Contract ended 3 Jan 2026, 149 days before the data date Past contract end Supply and construction of stormwater trunk lines with lift stations SL46 and SL47, left bank of Mosul Contract ended 9 Jan 2026, 143 days before the data date Past contract end Hamdaniya sewage project, Nineveh, with phase two of the networks, treatment plant and infrastructure works Contract ends 25 Aug 2026 On track Supply and construction of the treatment plant for the left bank of Mosul (phase one) Contract ends 8 Jun 2026 On track Supply and construction of the treatment plant for the right bank of Mosul, phase 2 Contract ends 12 Jan 2027 On track Sewage networks project, right bank of Mosul Contract ends 5 Nov 2026 On track
Source: Ministry of Construction, status as of 1 Jun 2026Details