On track
Second carriageway linking the Kifl to Qasim expressway, 30 km, Najaf (infrastructure)
Roads and bridges project No. 297 in Najaf.
مشروع ربط طريق المرور السريع كفل قاسم الممر الثاني بطول 30 كم في محافظة النجف ( بنى تحتية)
Actual progress 15.6% as of 1 Jun 2026
Where the plan says it should be 18.3% 2.7 points behind
Progress against plan
Contract ends 29 Aug 2028
Timeline
2025
2028
- Started
- 25 Aug 2025
- Contract end
- 29 Aug 2028
- Running for
- 0.8 years
- Data as of
- 1 Jun 2026