Past contract end
Design and construction of the road linking the Mohammed al-Qasim expressway and the Kirkuk to Baghdad road through Basatin and Suraidat, Baghdad
Roads and bridges project No. 283 in Baghdad.
تصميم وتنفيذ الطريق الرابط بين سريع محمد القاسم و طريق كركوك- بغداد مروراً بحي البساتين و السريدات في محافظة بغداد
Actual progress 77% as of 1 Jun 2026
Where the plan says it should be 100% 23 points behind
Progress against plan
Contract ended 22 Dec 2024, 526 days before the data date
Timeline
2023
Contract end
2026
- Started
- 11 Sept 2023
- Contract end
- 22 Dec 2024
- Running for
- 2.7 years
- Data as of
- 1 Jun 2026