Road projects in Anbar

The Ministry of Construction lists 11 road projects in Anbar: 3 past contract end, 1 on track, 7 completed, as of 1 Jun 2026.

Completed7
On track1
Past contract end3
Rehabilitation of the Ramadi to Rahaliya road, starting at the Kahawi area Roads and bridges No. 275 Contract ended 25 Aug 2025, 280 days before the data date Past contract end Maintenance and rehabilitation of the road linking Nukhaib and Karbala Roads and bridges No. 276 Contract ended 24 Apr 2026, 38 days before the data date Past contract end Widening of the embankment from the Saqlawiya concrete bridge to expressway intersection 51, 14.6 km, with a 2 km service road for low cost housing and a 1.7 km road from the Japanese bridge to the Nazim bridge Roads and bridges No. 274 Contract ended 10 May 2026, 22 days before the data date Past contract end Second carriageway of the Hit to Haditha road, section two, from km 25 to km 50 Roads and bridges No. 273 Contract ends 15 Jul 2026 On track Second carriageway of the Ramadi to Haditha road, 33 km, phase three, including Wadi Hajlan Roads and bridges No. 350 Completed Maintenance of the Ramadi to Hit road, 17 km Roads and bridges No. 352 Completed Rehabilitation of the Wadi Ghadaf bridge on the 160 km Nukhaib road, at km 54 Roads and bridges No. 353 Completed Rehabilitation and maintenance of the Ramadi to Qaim main road from the Muhammadi roundabout to the Bastamiya checkpoint, 32 km westwards Roads and bridges No. 355 Completed Maintenance, resurfacing and shoulder stabilisation of the Ramadi to Qaim main road from km 30.1 to km 47.1 (counting from the Haditha junction) Roads and bridges No. 357 Completed Rehabilitation of the road over the drain (Albu Haddad and Albu Shubail) Roads and bridges No. 358 Completed Rehabilitation of the road linking the villages of Albu Dhalil, Albu Dhib and Albu Dimna, 1,000 m long and 20 m wide Roads and bridges No. 359 Completed

Source: Ministry of Construction, status as of 1 Jun 2026Details