Drug test for postgraduate students in Iraq

الاستمارة الإلكترونية لإجراء فحص تعاطي المخدرات والمؤثرات العقلية لطلبة الدراسات العليا داخل العراق

How to do it

This service is offered online through the UR portal.

Open the UR portal

On the portal, search for the Arabic name shown above. Mukhtary is independent and is not part of the UR portal.

About this service

Agency
Ministry of Higher Education and Scientific Research
How to apply
Online
Kind of service
Interactive
Number in the list
1014

Source: UR portal, updated 26 Aug 2026Details