Past contract end
Additional floor for the Engineering Reconstruction Directorate building
Buildings project No. 7 in Baghdad.
أضافة طابق ملحق الى بناية دائرة الأعمار الهندسي
Actual progress 58% as of 1 Jun 2026
Where the plan says it should be 69% 11 points behind
Progress against plan
Contract ended 1 May 2026, 31 days before the data date
Timeline
2025
2026
- Started
- 10 Jul 2025
- Contract end
- 1 May 2026
- Running for
- 0.9 years
- Data as of
- 1 Jun 2026