On track
Musayyib, Iskandariya and Jurf al-Sakhar water project in Babil (2009)
Water project No. 229 in Babil.
مشروع ماء المسيب - الاسكندرية جرف الصخر في محافظة بابل /2009
Actual progress 87.6% as of 1 Jun 2026
Where the plan says it should be 96.9% 9.3 points behind
Progress against plan
Contract ends 19 Jun 2026
Timeline
2023
2026
- Started
- 14 Dec 2023
- Contract end
- 19 Jun 2026
- Running for
- 2.5 years
- Data as of
- 1 Jun 2026